Electric motors

Electric motors: nine lines the nameplate must answer

A replacement motor that matches on power alone often does not fit, overheats or trips its drive. The nameplate of the old motor already holds the whole specification.

Line Why it matters
Power, voltage and frequency The basics, and the first place mistakes are made
Speed or number of poles Sets the speed of everything downstream
Frame size and mounting Decides whether it bolts onto the existing base
Protection class Dusty plants need IP55 or better
Insulation class Class F with class B temperature rise is the usual margin
Efficiency class IE2, IE3 or IE4 changes the running cost every year
Duty type Continuous duty differs from frequent starting
Ambient and altitude Above 40 °C or 1,000 m the motor must be derated
Drive and area Converter duty and hazardous-area certification where they apply

Makers to know

Siemens and VEM (Germany), ABB (Switzerland) and Leroy-Somer (France) cover low-voltage and medium-voltage process motors.

Two cases that need extra care

Brand names belong to their owners and are listed as a buyer's reference.

All articles

Request a quote
Vida Parseh · Trade and management

The pillar your industry stands on

Parts, materials and know-how for plants that cannot afford to stop. One partner, from the first inquiry to the signed delivery.

Choose a region

Products

Whatever your plant is missing is one inquiry away

All products →
Delivery terms

Incoterms at a glance

Pick a rule. The model shows where risk and cost pass from seller to buyer.

Any mode of transport
Sea and inland waterway only
FOB Risk: Cost:
Seller Buyer Near lane on the ground: who pays. Far lane: who bears the risk. Drag sideways to turn the model.

FOB

Incoterms is a registered trademark of the International Chamber of Commerce. This model follows the 2020 edition. It is a teaching summary and does not replace the official ICC text.

How an order runs

From inquiry to delivery in four steps

  1. 01

    Inquiry

    You send the specification, quantity and destination.

  2. 02

    Technical match

    We check the technical fit and compare supply options.

  3. 03

    Written offer

    You receive a proforma invoice with price, Incoterm and lead time.

  4. 04

    Delivery

    Shipment, inspection and documents follow the agreed term.

Industry should not have to wait

Send the specification today. A written offer follows, with price, terms and lead time.